Project Overview

The Muskego High School pool has been transformed into a “swim auditorium.” Two additional lanes were added to the pool (for a total of eight), allowing more athletes to compete. Seating was expanded, doubling its capacity, providing 400 seats for spectators and increasing athlete seating to 196. Retractable bleachers allow dry deck space for the swim team and physical education classes.

The “swim auditorium” also includes a scoring mezzanine, two diving boards, a scoreboard, windows for natural light, a new cafeteria entrance point, an additional restroom, and increased storage space. The project also includes structural updates like a new roof and new HVAC and filtration systems.

Education Market Leader

Megan Prestebak / Vice President, Education, Education
920.969.7334
[email protected]

Owner:

Muskego-Norway School District

Size:

13,400 SF

Completion:

August 2018

Architect / Engineer:

Bray Associates Architects, Inc.

Share:

Contact Us TodayRegarding Your Next Project